FibreGrid successfully delivers FibreRAIL GRP handrail system at the £7 million Chorley Tunnel and Flying Arches reinstatement scheme.
The project which was originally scheduled to take place over a two year period was completed during a six week blockade. The huge time saving achieved was largely due to the ease and speed of installation associated with Fibregrid’s products.
FibreRAIL provides the look and performance of a custom made handrail system in an easily assembled, cost effective package.
FibreRAIL is expertly engineered to use the fewest number of handrail components of any system available facilitating an easier, faster installation.
- Extremely hard wearing and durable - Lightweight - Corrosion resistant - Speed of installation - Easy to handle and install - Excellent resistant to acidic compounds - Low carbon print - Low maintenance cost - Rapid installation - Long effective service life |
Products Used: